Inter Array Cables for SOFIA OFFSHORE WIND FARM PROJECT 1.4 GW
Factory Site/Quality Inspector at Cable Factory (Hellenic Cables S.A. FULGOR plant) on behalf of Van Oord responsible for reviewing technical drawings and documentation, engineering support, and daily quality surveillance of the manufacturing process from raw materials/goods inwards through to FAT and load out of the final lengths of Inter-Array Cables (38/66 kV submarine cables with interstitial armoured optical fibre cable ) for Sofia Offshore Wind Farm project (1.4 GW).
Platform Cables for Hai Long OFFSHORE WIND FARM PROJECT 1.05 GW
FAT on Platform cables XLPE/CWS/HDPE/LSZH 1 X 630 mm2 127/220 kV according to IEC 62067 and XLPE/CWS/HDPE/LSZH 1 X 400 mm2 38/66 kV according to IEC 60840 for Hai Long Offshore Wind Farm Project (1.05 GW).
Inter Array Cables for DOGGER BANK PHASE A AND PHASE B WIND FARM PROJECT 2 × 1.2 GW
Factory Site/Quality Inspector based at Cable Factory (Hellenic Cables S.A., FULGOR plant) on behalf of SSE (Scottish and Southern Electricity) responsible for reviewing technical drawings and documentation, engineering support and daily quality surveillance of the manufacturing process from raw materials/goods inwards through to FAT and load out of the final lengths of Inter-Array Cables (38/66 kV submarine cables with interstitial armoured optical fibre cable ) for the Dogger Bank Offshore Wind Farm project located at North-East of Scotland (2 X 1.2 GW – The world’s largest offshore wind farm).
Inter Array Cables for SEAGREEN WIND FARM PROJECT 1,075 MW
Factory Site/Quality Inspector based at Cable Factory (Hellenic Cables S.A., FULGOR plant) on behalf of SSE (Scottish and Southern Electricity)/SWEL responsible for reviewing technical drawings and documentation, engineering support and daily quality surveillance of the manufacturing process from raw materials/goods inwards through to FAT and load out of the final lengths of Inter-Array Cables (38/66 kV submarine cables with interstitial armoured optical fibre cable ) for the Seagreen Offshore Wind Farm project located at North-East of Scotland (114 turbines, 1075 MW – Scotland’s largest offshore wind farm when completed).
FAT on flexible MV cables 38/66 kV designed for wind turbines at PRYSMIAN (Draka- Germany) for Seagreen Offshore Wind Farm on behalf of SSE/SWEL.
FAT and Type Tests on back to back Offshore Joint Size 3A SEANEX and plug in Size 3A SEANEX cable connectors, 72.5 kV, PFISTERER for Seagreen Offshore Wind Farm on behalf of SSE/SWEL.
KAFIREAS LAVRIO INTERCONNECTION – TERNA ENERGY PROJECT 87/150 kV
Routine Tests, Type Tests and FAT on composite cable CU/XLPE/PB/SCPE/PPY/SSWA & HDPE Rods/PPY 3 X 1500 mm2, RM (Cu), 87/150 (170) kV and CU/XLPE/PB/SCPE/PPY/SSWA & HDPE Rods/PPY 3 X 1900 mm2, RM (Cu), 87/150 (170) kV cables with three (3) fibre optical cables on behalf of TERNA ENERGY.
SHENZI Boosting project 8.7/15 kV
Inspection and control activities during procurement of materials, manufacture, and testing of medium voltage (MV) Power cores to be used in MV submarine power cables 8.7/15 kV for power umbilical at Nexans Sub-Supplier Hellenic Cables S.A. for the SHENZI Boosting project on behalf of NEXANS NORWAY AS.
CLOV MPP Power Cable
Inspection and control activities during procurement of materials, manufacture, and testing of medium voltage (MV) Power cores to be used in MV submarine power cables or power umbilical at Nexans Sub-Supplier Hellenic Cables S.A. for the CLOV MPP Power Cable on behalf of NEXANS NORWAY AS.
Trans Adriatic Pipeline (TAP).
Expediting on manufacturing status for LV and MV cables on behalf of Trans Adriatic Pipeline (TAP).
PHOTOVOLTAIC PROJECTS 18 MW + 17 MW
Inspections on MV Panels, transformers and inverters for ASSEMINI 18 MW Photovoltaic project on behalf of Eni S.p.A..
Inspections on MV Panels, transformers and inverters for PORTO TORRES 17 MW Photovoltaic project in Italy on behalf of Eni S.p.A..
KAFIREAS 1 WIND FARM PROJECT
Inspections on LV and MV cables (FAT) at NEXANS Hellas for Kafireas wind farm project on behalf of Enel Green Power (EGP).
OTHER PROJECTS
MV cables (type tests)
MV cables (FAT)
LV cables (type tests)
Fiber optical cables (type tests)
Inspections on Oil Type Transformers 2500 kVA – 11/0.725 kV and 11/0.420 kV (FAT) for Sousse Desalination Plant Project on behalf of ABENGOA
VPIM at Seaway Technologies GmbH, Greece for KOC Project: NEW 48” CRUDE TRANSIT LINE FROM NORTH KUWAIT TO CMM on behalf of KUWAIT OIL COMPANY (KOC).